Demolition Works: Removal of outdated features to prepare the space for new construction and facilities.
Structural Modifications: Installation of supporting beams and breaking through existing walls to form new doorways, ensuring both stability and functional design.
Roofing and Ceiling Works: Repair and reinstatement of the roof and ceilings to improve durability and aesthetics.
Construction of internal walls and the installation of new doors and windows to redefine the layout and enhance natural light.
Mechanical and Electrical Works: Upgrading systems to meet modern standards, including new lighting, plumbing, and ventilation to support the café’s operational needs.
New Facilities Installation: Fitting a fully equipped kitchen to support café operations.
Installing accessible bathrooms, including shower facilities and an adult changing area to cater to disabled visitors.
Flooring and Decorations: Laying durable, easy-to-maintain flooring and applying high-quality finishes throughout the space to create a welcoming and professional atmosphere.
Adapting the café block while maintaining the integrity of the existing structure required careful engineering solutions. We implemented reinforced beams to ensure stability while modifying internal layouts.
Since Amelia Trust Farm remained operational during the renovation, our team scheduled construction phases strategically to minimise disturbances to ongoing activities.
Ensuring the newly installed amenities met modern accessibility standards involved close coordination with regulatory bodies and specialist consultants.
Highland Construction (Bridgend) Ltd
Call: 01656 720 330
Email: info@highland-services.com
Office Address:
1a Attlee Street,
Brynmenyn Industrial Estate,
Brynmenyn, Bridgend,
CF32 9TQ