The contract included enabling works required to provide uninterrupted temporary electrical power to critical areas including emergency 999 call centres, leading to the eventual modification of plantroom electrical services. As part of the electrical distribution equipment replacement, an automatic monitoring system was installed to provide recording and analysis of energy usage.
Key deliverables included:
- Completion of UPS Control Panel upgrade and changeover switch
- Completion of new Main Switch Gear Panel installation
- Site wide shut down and reenergising new Main Switch Gear Panel
- Completion of new sub mains and installation of new sub-switchgear
Asa live police headquarters with people working in all areas, an initial challenge was the reduction of any potential disturbance.
An effective coordination and communication with both Dyfed-Powys Police and the client representative was key. Highland Services ensured this through our comprehensive communications plan with weekly meetings via Microsoft Teams and by having Project Manager Stephen Pritchard based on-site.