Contract Value
£2,200,000
Contract Period
Nov 2015 - Apr 2017
Sector
£2,200,000

Project Overview

Highland Services provided various works to Willmott Dixon and direct to South Wales Police during the block extensions and refurbishment of the South Wales Police HQ.The project included a full electrical rewiring for the building and full LED lighting upgrade throughout for energy savings, cost savings, and longevity.During the project the design drawings changed multiple times to ensure the end client, South Wales Police had the most productive work space possible. Highland adapted to these daily changes and provided valuable input to the designers to encourage revisions to get the best results for South Wales Police.

Services Delivered

  • High Voltage Transformer Upgrade (direct)
  • 3 x Generators (direct)
  • New Distribution & Sub-Mains
  • New Lighting with Controls (Dali System)
  • New Fire Alarm & Access Control System
  • New Lightening Protection
  • New IT

Challenges & Mitigations

Challenge

Mitigation

Challenge

Mitigation

Challenge

Mitigation

Get in Touch

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Contact Details:

Call: 01656 720 330
Email: info@highland-services.com

Office Address:
1a Attlee Street,
Brynmenyn Industrial Estate,
Brynmenyn,
Bridgend,
CF32 9TQ