Complex Cabling Routes
The project required running multiple types of cabling – electrical, fibre-optic, and Cat 6 – through challenging areas of the Port Talbot site, including the cold mill zone.
Our team carried out detailed planning and used containment solutions to navigate the cabling routes efficiently. We worked closely with site engineers to design pathways that avoided interference and maintained compliance with operational constraints.
Maintaining Operational Efficiency During Relocation
Relocating cabins and installing new infrastructure without disrupting Tata Steel’s ongoing production activities demanded careful scheduling and site coordination.
We implemented a precise project timeline and worked collaboratively with Tata Steel engineers to align our activities with production windows, minimising downtime and maintaining continuity of operations.
Stringent Safety and Compliance Requirements
Working in a high-risk industrial environment with strict safety regulations required all installations to meet the latest standards, including the 18th Edition wiring regulations.
All electrical infrastructure was designed and installed to meet regulatory standards. Our team prioritised safety at every stage, ensuring compliance with industry best practices and site-specific protocols.